We are pleased to announce work is commencing at Tyneside Safety Glass in Gateshead where we will build an extension onto their existing building.
The works comprise of the construction of 2 single storey steel framed extensions for material storage and a machinery room, with some internal alterations where walls breakthrough into existing production areas.
Phase 1 is a steelwork frame, externally clad with an inner block skin and a concrete floor. Phase 2 has traditional brick and block external walls and a block and beam floor.
Both phases are to run simultaneously.